Delivery Schedule

To determine delivery lead times (not including shipping), select all required features. The longest delivery time of the features selected will determine the delivery time for the product.

Weeks are based on standard business days, which are Monday to Friday, excluding holidays.

The delivery schedule below applies to the CLASSIC, BASIC & CMP Series.

Delivery times are based on orders up to 20 switches. For larger quantities, please contact sales@kayden.com for a delivery schedule.

Delivery Time: 1 week 2 weeks 3-4 weeks 2-10 weeks
Material of
Construction -
Sensor
316 Stainless
Steel
Exotic Alloys
Process
Connection
3/4", 1", 1 1/4",
1 1/2" & 2" MNPT
Flanges:
316 Stainless
Steel & Carbon
Flanges:
Exotic Alloy
Insertion
'U' Length
Standard:
1.2", 2", 4", 6",
9", 12", 18" & 24"

Packing Glands:
6", 12", 18", 24",
36", 48" & 60"
Custom
Insertion 'U'
Lengths
Remote
Electronics
Enclosure
Cable
Equipment
Tags
Stainless Steel,
Lamacoid, Paper
Additional
I.O.M. Manuals
I.O.M. Manuals
Accessories /
Spare Parts
SCA Adapters,
RCMS Software
Drawings &
Parts List
Standard
Drawings
Customized Drawings
Certificates &
Documentation
Certificate of
Origin, Certificate
of Conformance,
Certified Material
Test Report,
Certificate of
Hydrostatic Test
on Sensing
Element, Agency
Approval
Certificates, Priced
Recommended
Spare Parts List
Factory Set
Points, Certificate
of Calibration,
Performance
Test Curve
Certificate of
Calibration -
NIST Traceable,
Certification of
Dye Penetrant
Inspection,
Certification of
Radiographic
Inspection,
Performance Test
Curve - NIST
Traceable